The Vision
To deliver a purpose-built Burger King restaurant and drive-through facility, creating a fully serviced, operational site with the infrastructure required to support a high-volume national food and beverage operator.
The Mission
This commercial development at Chandlers Wharf involved the construction of a new drive-through restaurant, together with the associated access routes, external works and utility infrastructure.
The 22-week construction programme commenced in February 2001 and covered the complete building shell and supporting site works. The scope included site clearance, reduced-level excavation, reinforced concrete floor construction, structural steelwork, masonry, timber roof structures, pitched and flat roof coverings, architectural glazing and automatic entrance doors.
Specialist drive-through elements included bespoke serving-bay windows, ordering and detector-loop infrastructure, signage foundations, illuminated-sign ducts, a CCTV tower and purpose-designed service points. The external works incorporated drainage, kerbing, paving, road surfacing, line markings, traffic-island alterations, landscaping and a dedicated refuse compound.
The project also required comprehensive foul and surface-water drainage, including a grease trap, trapped floor gullies and connections serving the commercial kitchen. Incoming gas, electricity and water services were coordinated and installed as part of the works.
A series of evolving operational and tenant requirements were successfully incorporated during construction, including revised internal layouts, enhanced drive-through windows, additional roof-plant supports, upgraded insulation and alterations to the restaurant’s service infrastructure.
The completed project demonstrates MLC’s longstanding experience in delivering technically coordinated restaurant and drive-through developments, combining the main building works with the specialist infrastructure, servicing and external environment required for a successful commercial operation.
More case studies
Progressive Investments Ltd – Howdens Warehouse Programme
To deliver a fast-track programme of purpose-built and refurbished warehouse facilities across the North of England for Howdens, supporting the continued growth and operational requirements of a major national kitchen and joinery distributor.
The Scotts Company Ltd, Howden Dyke, Goole
To deliver a purpose-built, covered storage facility for chemical ingredients used in fertiliser production, enabling efficient handling from vessel delivery through to onward distribution.